Why Following Quality PV Design is Key to Long-Term Performance (part 3)

By Pijus Sciuckas, Design Engineer at Detra Solar.
Introduction
In Part 2, we examined drainage design and soil stability, concluding that proactive water management is a fundamental engineering requirement for a profitable solar asset. In Part 3, we turn our attention to equipment placement – specifically analyzing inverter sheds, transformer substations, and key physical layout optimization strategies.
Much like poor drainage design, errors in equipment positioning create long-term operational bottlenecks. From avoidable module shading to inaccessible oil containment pits, strategic placement impacts both immediate construction logistics, decades of site maintenance, and emergency responses.
The following examples and recommendations are drawn directly from our ongoing site visits, field observations, and feedback from managing O&M teams.
3. Equipment Placement
Inverters
As a cornerstone of PV plant design, inverter positioning, relative to connected string arrays and structural rows, directly influences DC/AC electrical losses, equipment longevity, and long-term maintenance accessibility.
While inverter placement is typically optimized to minimize electrical losses, a holistic design must also prioritize ergonomic installation and unhindered physical access for field technicians.
Inverter Positioning in Fixed-Tilt Systems
|
Mounting inverters too close to the ground simplifies initial placement but complicates cable routing and ongoing maintenance access. Designers often treat minimum ground clearance guidelines (e.g., 0.6 m) as an upper limit rather than a floor. When scaled across dozens or hundreds of inverters, this practice creates significant operational and maintenance constraints. The solution is to design positioning relative to top structural clearances rather than ground minimums targeting top clearance boundaries (e.g., 0.3 m from the frame top) to maximize working height and improve access. Elevating inverter mounting heights also reduces vegetation interference and simplifies routine ground maintenance around key components. |
![]() |
Beyond vertical positioning, horizontal placement within the mounting structure requires careful evaluation.
![]() |
Recessing inverters deeper within the structural framework offers distinct operational advantages over standard exterior mounting: Enhanced Clearance: Improves machinery maneuverability during ground maintenance and site construction. Environmental Shielding: Provides superior protection against harsh weather, mitigating component degradation rates over time. Routing Considerations: Requires detailed initial cable planning to avoid routing clashes around foundation piles during AC cabling installation. |
Of course, these solutions are only applicable to fixed tilt designs. When using single-axis trackers, inverters need to be housed between rows or on the tail ends of rows. I use the word ‘housed’ for a reason: when an inverter sits outside the module frame, we tend to call such constructions ‘Inverter sheds’.
Inverter Positioning in Tracker Systems
The comparison below illustrates two distinct operational approaches to inverter shed construction:
![]() |
![]() |
Beside the construction height (same as in a fixed tilt design), the main two considerations should be the design of the shed itself and its location relative to the modules.
My point being, in the first picture you can see a flimsy metal sheet roof provided by the inverter manufacturer and on the right, a purpose built custom shed with a roof that is as sturdy as the foundation. Obviously, no O&M team would look at the first build and think to themselves that it’s a good solution in the long run.
As for the location, inverter sheds and transformer stations (and any other buildings) should be positioned to minimize shadow cast on active modules – ideally aligned northward where feasible, or positioned along central maintenance corridors on SAT sites.
Transformers
While transformer design shares cable loss and shading considerations with inverters, these complex units present unique challenges from flooding risks caused by poor elevation to selecting the optimal foundation design.
Transformer Substation Design
Transformers are typically supplied as packaged substations pre-configured for compatibility, fire safety, and regional IP protection ratings.
However, when custom or standalone substations are required, key thermal and structural factors must be evaluated:
![]() |
![]() |
An open, “caged” enclosure design (left) provides active thermal management, whereas a fully enclosed custom housing (right) risks creating a ‘sauna” effect that leads to overheating, particularly in warmer climates.
Transformer Elevation & Mounting
While maximum height regulations often limit raised elevations, placing substations downslope introduces far greater operational risks.
|
I used the picture on the right at the start of this article since it represents every topic of part 3. In this case, it is a great example of what building down slope looks like and the obvious consequences: Soil erosion: right off the bat, you can see that the construction works made the nearby hill so steep that now erosion is threatening the nearby frame piles. Meaning, that time and money has to be spent to actively mitigate this issue which could have been avoided in the first place if the location was a) chosen more carefully using open source and free terrain data and b) a site visit was organized after the initial layout review. Water ingress: since the sub-station is situated down-stream and because of the design of the building itself, water accumulates below the transformer in the oil containment pit. Therefore, alongside the usual maintenance works during the rainy months, now pumping operations are a necessity to ensure safety if an emergency occurs. |
![]() |
And on the topic of oil pits, some sub-station designs require excavation works to access said compartment after installation. Therefore, another good practice to consider is access openings from above. We have seen cases where a pipe was connected to the container’s pit but buried, meaning you’d still need to spend time and energy to access the tank before anything can be done about the water, oil or both.
Foundation design: to finish this topic, I’d like to also share some insight on the sub-station foundations themselves. Below you can see a picture of 3D printed concrete foundations from the UK National Grid:

Even though they had to partner with a Finnish company to achieve such designs, pole based foundations, even if directly poured the legacy way or manufactured, not only save on concrete but allow for superb cable management under the substation.
Most projects plan for cable ducts inside traditional monolithic foundations which have two main drawbacks: 1. if not enough duct entries are designed, there is a risk of lacking space for all required cabling and 2. Even after accounting for cable bending radii, in case of needing a thicker cable, the inside bends might be insufficient.
Therefore, freeing up as much space under the substation is not only more cost effective upfront but a sure way to combat cable related risks in future development via omnidirectional access.
In Summary
Strategic placement of key PV infrastructure such as inverters and transformer sub-stations is vital to maintaining long-term asset efficiency and operational longevity. Optimizing inverter height and recessing units within fixed-tilt structures improves ergonomic access, protects against weather degradation, and allows for easier logistics during maintenance. In tracker systems, installing sturdy, purpose-built inverter sheds positioned to avoid shading ensures optimal performance.
For transformers, selecting elevated, open-frame designs prevents overheating and water ingress while avoiding costly soil erosion. While, adopting forward-thinking layout and foundation choices such as pole-based transformer foundations minimizes installation clashes and moves forward long-term return on investment goals across the plant’s operational lifespan.
Coming Up in Part 4: General Layout Optimizations
Moving away from equipment placement, the final frontier for long-term asset efficiency lies in general layout optimizations. I will explore standard-setting practices across various sites from spherical SAT bearings adapting to terrain irregularities to trench splits improving cable logistics. I will also examine common execution pitfalls, such as excessive row lengths causing voltage drops and structural challenges on uneven terrain. Stay tuned!